Mission Park Funeral Chapels & Cemetaries
Location: San Antonio (10 locations) Install Date: July, 2017 to February, 2018 System Size: 534.32kW (combined) Solar Contribution: 55% (combined)
Location: San Antonio (10 locations) Install Date: July, 2017 to February, 2018 System Size: 534.32kW (combined) Solar Contribution: 55% (combined)
Location: Austin Install Date: July, 2019 System Size: 109.9kW Solar Contribution: 50%
Location: San Antonio Install Date: July, 2019 System Size: 152.5kW Solar Contribution: 37%
Location: Hutto Install Date: September, 2016 System Size: Two 60kW systems Solar Contribution: 50%
Location: Fort Worth Install Date: August, 2018 System Size: 21.6kW
Location: Austin Install Date: September, 2015 System Size: 398kW Solar Contribution: 60%